Floating Production Intelligence

Floating Production Intelligence

  • Annual five year outlook and forecast FPSO database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.

Order Now!

Request a Demo
Statoil Logo

Headquarter

Forusbeen 50
Stavanger4035
Norway
+47 51 99 00 00

Statoil Claims Mokul Nordic for North Sea Charter 8/26/2014 10:58:18 AM

Nordic Maritime’s latest fleet addition wins first work with energy giant. Nordic Maritime has announced its newest DP2 vessel, Mokul Nordic, has been contracted for a 30 days firm plus an optional 15 days charter in the North Sea by international energy provider Statoil.

Statoil: Aasta Hansteen Moving Boundaries 8/26/2014 8:35:35 AM

Aasta Hansteen and Polarled are moving the boundaries for technology, deep waters and ripple effects on the Norwegian continental shelf (NCS). "Aasta Hansteen is one of the biggest and most complex industrial projects in Europe. With the Polarled…

Statoil to Hold Back US Shale Ramp Up 8/25/2014 10:54:01 AM

Norwegian energy firm Statoil will only slightly raise its U.S. shale oil and gas output in the near term due to spending curbs, well below a potential for a 50 percent surge, the firm said on Monday. Statoil, which produces around a tenth of its oil and gas from its U.S.

Kongsberg Maritime 8/25/2014 2:30:01 PM

Strandpromenaden 50, Horten, Vestfold, Norway 3183 T: +47 32 28 50 00 E: subsea@kongsberg.com W: http://km.kongsberg.com CEO/President: Geir Håøy VP: Bjørn Jalving, EVP, Subsea Division Number of Employees: 4396   The Company Company Mission: Maximizing performance by providing The Full Picture.

Johan Svedrup Design Two-Thirds Complete 8/26/2014 3:34:25 AM

Aker Solutions says it has assembled one of its biggest engineering teams ever to deliver the initial plans for the engineering and design phase of the giant North Sea Johan Sverdrup oil deposit. The company says it is on track to deliver the first draft report due in the fourth quarter…