Floating Production Intelligence

Floating Production Intelligence

Energean Power FPSO Hull Leaves China

April 3, 2020

Floating Production Intelligence LLC.
Energean Power HUll Source Energean.jpg

Mediterranean Sea-focused oil and gas company Energean Oil and Gas has informed that its Energean Power FPSO Hull sailed away from the COSCO yard in China on Friday, April 3, 2020.

The hull will now be towed to the Sembcorp Marine Admiralty Yard in Singapore, where the topsides will be integrated before the completed FPSO is towed to the Karish field in Israel for installation and hook-up. The offshore gas field sits at a water depth of 1,750 meters.

"The sail away of the hull from China represents the achievement of a key milestone in the Karish project timetable," Energean said.

According to Energean, the first gas on the Karish project is on track for H1 2021.

Energean has previously said that the completed FPSO is expected to sail away from Singapore towards Israel at the 2020 year-end.

So far, Energean has secured firm gas sales from the Karish development of 5.0 bcm/yr with a further 0.6 bcm/yr to be converted to a firm basis immediately on publication of a satisfactory Karish North CPR, expected at the end of March 2020.


Floating Production Intelligence

  • Annual five year outlook and forecast FPSO database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.

Order Now!

Request a Demo