Floating Production Intelligence

Floating Production Intelligence

LR Verifies BP FPSO Glen Lyon

June 15, 2017

Floating Production Intelligence LLC.
Glen_Lyon.jpg
The Glen Lyon floating production storage and offloading (FPSO) vessel, BP’s newest North Sea asset, was awarded full-term classification certificates for service in the Schiehallion and Loyal fields, 175 km west of Shetland. 
 
Conditions west of Shetland are among the most severe in the UK and Glen Lyon must be capable of operating in extreme weather. Classification means the Glen Lyon FPSO has been verified for operation to the highest levels of safety and performance by LR.
 
Glen Lyon is the world’s largest harsh water FPSO and formed part of BP’s multi-billion-pound Quad 204 project. BP announced first oil from the Glen Lyon on 22 May. Production is expected to ramp up in the coming months, eventually reaching up to 130,000 barrels of oil per day.
 
LR has worked with BP on the Glen Lyon project since 2011; through FEED, detailed design, construction and commissioning. It has been a long-term engagement involving hundreds of LR staff from more than 30 offices across the UK, Europe, Asia and the Americas.

Floating Production Intelligence

  • Annual five year outlook and forecast FPSO database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.

Order Now!

Request a Demo