Sparrows Group Bags 5-year Maersk Oil Contract
Sparrows Group has secured a five year contract to deliver hydraulic, lifting and rigging services for Maersk Oil’s UK floating assets.
The agreement will see Sparrows support the operator in strengthening its lifting operations for the Global Producer 3 (GP3) and Gryphon FPSO’s and the new Culzean FSO.
The scope encompasses hydraulic services including maintenance, repair and parts and materials procurement; as well as the supply, management and certification of all lifting gear.
Additional mechanical engineering services, including failure modes, effects and criticality analysis (FMECA) studies; finite element analysis; the design and build of structural and mechanical assemblies and small pressure vessels; reverse engineering and fabrication; and Lifting Operations and Lifting Equipment Regulations (LOLER) inspections, are also included.
The Culzean gas condensate field has resources estimated at 250-300 million barrels of oil equivalent. Located in the Central North Sea, the high pressure, high temperature field is expected to start in 2019 and produce enough gas to meet 5% of total UK demand at peak production in 2020/21.
The value of the contract was not disclosed.